Home › Neighbourhoods › Downtown Barrie
Barrie neighbourhood moving guide
Waterfront condo towers, apartments above Dunlop Street and century homes on the hill. Elevator bookings, loading docks, street closures and how to make a house fit a suite.
Who moves condos, apartments and businesses in downtown Barrie?
Barrie Movers, operated by Macho Movers Inc., moves residents and businesses in downtown Barrie, including the waterfront condo towers, the apartments above Dunlop Street and the older homes on the hill behind. We book around elevator times and building rules, and we work every day from 8 am to 10 pm.
Downtown Barrie curves around the western end of Kempenfelt Bay. Dunlop Street, the main street, runs a block back from the water, lined with brick storefronts from the 1800s. Between it and the lake stand the condo towers that have changed the skyline over the past twenty years, and behind it the ground rises through streets of churches, offices and century homes. It is the most interesting part of the city to live in and the most demanding to move in. Almost nothing here has a driveway. Almost everything has a rule. This guide explains how to work with both.
| Part | Where | Homes | What moving looks like |
|---|---|---|---|
| The waterfront towers | Between Dunlop Street and Lakeshore Drive, from Toronto Street east to beyond Mulcaster Street | Condominium apartments from one-bedroom suites to penthouses | Loading docks, service elevators booked by the hour, long hallways |
| The main street | Dunlop Street East and West, Bayfield Street, Clapperton Street and the lanes behind | Apartments above shops, plus a few lofts and converted offices | Narrow stairs, rear lanes, metered parking and no elevator |
| The hill | Collier, Worsley, McDonald, Owen, Mulcaster, Poyntz and Berczy Streets and the blocks north | Century houses, many divided into flats or offices, and small apartment buildings | Street parking, front steps, tight old staircases |
Many people who move downtown are leaving a house elsewhere in Barrie for a condo by the lake. Others are arriving from Toronto, drawn by the water and the GO train at Allandale Waterfront, a short walk or drive along the shore. A third group lives and works above the shops. Each needs a different plan, and the sections below take them in turn.
The place where downtown stands was the southern end of the Nine Mile Portage, a route across to Willow Creek and the Nottawasaga River that was used long before European settlement and became a British supply line during the War of 1812. Settlement followed in 1828. Barrie was made a village in 1854, a town in 1870 and a city in 1959, and it is named for Sir Robert Barrie, a naval officer who commanded on the Great Lakes.
Dunlop Street took shape in the middle of the 1800s. The meeting of Dunlop, Bayfield and Clapperton Streets was already called Five Points in the nineteenth century, and the wedge-shaped building at its tip, put up as the Simcoe House hotel in 1857, still stands. Several churches on the hill date from the same decades, including Trinity Anglican and Collier Street United, both from about 1864, and St. Andrew's Presbyterian from about 1882.
The waterfront was once railway land. Memorial Square, at the foot of Owen Street, marks the end of the portage and the site of Barrie's old station and post office. Today it holds the cenotaph, and beside it Meridian Place, opened in 2018, steps down toward the bay as the city's main outdoor gathering place. Dunlop Street itself was rebuilt between 2019 and 2021 with wider sidewalks and a surface level with the roadway, so that it can be closed to cars for events. The towers came in the same period, and more are on the way, from the Lakhouse building at the east end to twin thirty-three-storey towers at Dunlop and Mary Streets in the west.
The condominium buildings near the water include Grand Harbour and Water View at the west end near Toronto and Simcoe Streets, the Nautica buildings on Ellen Street, Bayshore Landing on Dunlop Street East, Lakhouse farther east, and newer towers along Dunlop Street West, with others under construction or planned. Each is run by its own condominium corporation and management office, and each has its own procedure. The details differ, but the pattern is the same almost everywhere.
| Typical rule | Why it exists | What we do |
|---|---|---|
| Moves only within the booked window | Other residents need the elevator | Arrive early, stage everything and finish with time to spare |
| Hallway and lobby floors protected | Finishes are costly to repair | Lay our own runners from the dock to your door |
| No propping of fire doors | Fire code | Station a mover at the door |
| No moving trucks in visitor parking or the garage | Clearance and access | Use the dock or the street, and shuttle with dollies |
| Cartons broken down and removed | Recycling rooms overflow | Take flattened boxes away on request |
The single most useful thing to understand about a condo move is that the elevator booking is the deadline, not the truck. A two-bedroom suite can be emptied in three hours by a good crew, but only if nothing slows the flow between the unit and the dock.
If you are moving from one downtown tower to another, both buildings need a booking. The move-out window should come first, with at least an hour between the two for loading and the drive, even if the drive is only three blocks.
The most common downtown move is a couple leaving a family home in Bayshore, Ardagh or the East End for a suite with a view of the bay. The suite is lovely and about a third the size of the house. Getting from one to the other is a matter of measuring and deciding, and it should start two months before the truck.
| Step | What to do |
|---|---|
| Get the floor plan | Ask the builder, agent or management office for a plan with dimensions. Measure the suite yourself if you can |
| Measure the path in | Elevator cab and door, corridor width, suite door, and the hall inside the door. Many suites have a tight turn at the entrance |
| Choose the anchor pieces | The bed, the sofa, the dining table and one or two things you love. Check each against the plan |
| Let the rest go | Offer furniture to family, sell it or donate it before the move, not after |
| Count the storage | A locker is typically a wire cage of a few square metres. It will not hold the contents of a basement |
| Think about the balcony | Patio furniture must suit the wind at height. Barbecue rules vary by building |
| Plan the bike and the car | Know your parking space, its height limit and where bicycles are kept |
People are often surprised by what does not fit: the sectional, the king bed with a large headboard, the eight-seat dining table, the wall unit. They are equally surprised by how little they miss them. If you cannot decide on a few pieces, a short stay in storage buys time. Our seniors and downsizing page has a fuller plan.
The upper floors of the old commercial buildings on Dunlop, Bayfield and Clapperton Streets hold some of the most characterful apartments in Barrie, with high ceilings, tall windows and brick walls. They were built long before anyone thought about moving a refrigerator.
Large furniture is the usual sticking point. Sofas that separate, platform beds that come apart and a split box spring are the practical choices for these apartments. If you are leaving one and wondering how a piece ever got in, tell us. Sometimes the answer is that a window was removed, and that needs to be planned.
North of Dunlop Street the land climbs through Collier, Worsley and McDonald Streets and beyond. These blocks hold some of Barrie's oldest houses, large brick and frame homes from the second half of the 1800s and the early 1900s, along with the churches, the library, City Hall and the MacLaren Art Centre. Many of the houses are now offices, clinics or flats. Others are still single homes, restored with care.
If your home is a designated heritage property or lies within one of the city's historic neighbourhoods, nothing about moving furniture requires a permit, but it is a good reason to walk the route with the crew lead and point out what matters. For similar houses farther east, see the East End guide.
Downtown is the city's stage, and the stage is often in use. Before fixing a date, check what is happening on the street outside your door.
| Event | When | Effect on a move |
|---|---|---|
| Open Air Dunlop | Selected weekends in summer | Dunlop Street is closed to vehicles so restaurants and shops can spill onto the road. No truck access on the closed blocks |
| Kempenfest | The August long weekend | Very heavy traffic and full parking along the waterfront and Lakeshore Drive |
| Winterfest and winter events | February and the holiday season | Crowds at Meridian Place and Heritage Park |
| Canada Day and New Year's Eve | July 1 and December 31 | Road closures near the waterfront and fireworks crowds |
| Parades and runs | Various dates | Rolling closures on Dunlop Street and Lakeshore Drive |
| Farmers' market | Saturday mornings at City Hall | Busy sidewalks and parking around Collier and Mulcaster Streets |
| Construction | Ongoing as new towers rise | Lane closures and crane lifts. Check your block the week before |
The City of Barrie and the Downtown Barrie business association publish event calendars and road-closure notices. A two-minute check can save a morning. If your building's dock is on a street that will be closed, ask the management office what access is provided for residents on those days.
Downtown businesses turn over, expand and renovate constantly, and moving them is a different craft from moving a household.
A walk-through is the first step for any business move. We label everything to the new floor plan and schedule the work so that you open on time. See office and commercial movers.
From a detached home elsewhere in Barrie to a suite by the bay. The planning is in what to leave.
Downsizing →Buyers and renters from the Greater Toronto Area who want the water and still commute by GO from Allandale Waterfront.
GTA moves →First apartments above the shops or in the older rental buildings. Small loads and many stairs.
Residents who lock the door for the winter. Moves are timed for spring and autumn, often with a storage component.
Storage →Restaurants, shops and offices along Dunlop, Bayfield and Collier Streets.
Commercial moves →Because suites are small, downtown moves are often quick in hours and precise in timing. The estimate depends far more on the building's rules and the length of the carry than on the number of rooms.
In a house, the truck is ten metres from the door. In a tower, the distance from your sofa to the truck may be a hundred metres or more: along the corridor, down in the elevator, through the service hall, across the dock. Every item makes that trip. It is the reason condo moves take longer per piece than house moves, and the reason equipment matters.
You can shorten the carry yourself. Ask the management office which elevator and which door are closest to your suite, and whether the truck can use the dock nearest that elevator. In some buildings the difference between two docks is a five-minute walk for every load.
Barrie receives close to three metres of snow in an average winter, and the downtown shoreline adds wind straight off the ice of Kempenfelt Bay. Towers are the easiest places in the city to move in winter, because the dock is covered and the route is indoors. The main street and the hill are harder.
See winter moving in Barrie for the complete list.
A typical move from a three-bedroom house in the south end to a two-bedroom suite in a waterfront tower, with the elevator booked from 1 pm to 4 pm.
| Item | Downtown considerations |
|---|---|
| Upright piano | Fits most service elevators. Check the weight limit posted in the cab. See piano movers |
| Grand piano | Goes on its side on a board. The elevator diagonal and the suite entrance decide whether it is possible |
| Large artwork and mirrors | Carried upright on a panel cart. Tall pieces may be limited by the elevator height |
| King mattress and box spring | The mattress bends slightly. A one-piece box spring often will not fit. Use a split one |
| Sectional sofas | Order of entry matters. The longest section goes in first while the suite is empty |
| Exercise bikes and treadmills | Heavy but compact. Check your building's rules on noise and placement |
| Safes | Ask the management office about floor loading before bringing a heavy safe into a suite. See safe movers |
| Appliances | Suites usually come with their own. If you are bringing a fridge or washer, measure the alcove and the doors. See appliance movers |
| Plants | Tall plants lie down in the elevator. In winter they travel in a heated car, not the truck |
| Bicycles and kayaks | Go to the bike room or locker, not through the lobby, in most buildings |
Moving out of a condo has as many steps as moving in, and they are easy to overlook when your mind is on the next home.
Tenants should also check the notice period in their lease and Ontario's tenancy rules well ahead of time. Owners who are selling should ask their lawyer what the buyer is entitled to find on closing day. This is general information, not legal advice.
We provide written estimates and do not post rates. What a move costs explains how they are built. When you call, have the building name, the floor and the move-in rules to hand, and the estimate will be accurate the first time.
Neighbouring guides: Allandale along the shore to the south, the East End beyond Berczy Street, Sunnidale to the west and Cundles and Bayfield up Bayfield Street. All areas are on the neighbourhoods page, and all services under services, including house movers and packing.
Yes. We move suites in all the downtown and waterfront buildings, working to each building's elevator booking and move-in rules.
Almost always. Contact your management office for the move-in package, reserve the service elevator and send us the time window.
Yes, on request. Send us the wording the corporation requires a few days before the move.
A one-bedroom suite usually takes two to four hours and a two-bedroom three to five, depending on the length of the carry and the elevator.
Measure the cab, including the diagonal from the bottom front to the top back, and compare it with the length of the sofa. Tell us if it is close.
Yes. Tell us where the entrance is, how many stairs there are and whether there is a rear lane.
We cannot bring a truck onto closed blocks. Check the event calendar and ask your building how residents get access on those days.
At the building's loading dock or lay-by where there is one, otherwise in a loading zone or a street space arranged in advance.
Yes. We can move the pieces that fit, deliver others to family and place the rest in storage.
Call (519) 830-4974 or send the form. Have your building name, floor and move-in rules ready.
Tell us where you are moving from and to, the date you have in mind and anything heavy or unusual. We reply during business hours with a clear written estimate.